An exterior route. ¥2,000 a day is a food and drink allowance. The trains, subway and tram for both days (¥5,110) are in the budget; hotels and shopping are extra.
Several 2007 places have changed: the former Takashimaya Sakai closed in January 2026, the Ōhama gymnasium was replaced in 2021 and Zepp Osaka closed in 2012. At those points you visit the site, not the building from the series.
Day 1 covers Sakai on foot with one tram ride; day 2 strings trains and subway together around the bay and central Osaka. Both days start and end at Namba.
Namba → Sakai-Higashi · the railing from the endingFrom Nankai Namba to Sakai-Higashi (¥290, 13 min).
Nankai Kōya line · ~15 min · ¥290Sakai-Higashi · the railing from the ending → Former Takashimaya Sakai intersectionFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 100 mFormer Takashimaya Sakai intersection → View toward the former GIORNOFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 200 mView toward the former GIORNO → City hall observation deck · the view from the endingFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 150 mCity hall observation deck · the view from the ending → Sakai-Higashi Ginzagai shopping arcadeFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 400 mSakai-Higashi Ginzagai shopping arcade → Kimono Ohara frontageFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 50 mKimono Ohara frontage → Ōshōjibashi footbridge · the endingFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 50 mŌshōjibashi footbridge · the ending → View toward Honganji Sakai BetsuinFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~10 min · 750 mView toward Honganji Sakai Betsuin → Former Kansai Urban BankFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~10 min · 700 mFormer Kansai Urban Bank → Ship relief in SakaiFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 250 mShip relief in Sakai → Historic San-Ei Sky Parking siteFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 150 mHistoric San-Ei Sky Parking site → Shukuin intersectionFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 200 mShukuin intersection → Historic mailbox near Sakai Station south exitFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~10 min · 550 mHistoric mailbox near Sakai Station south exit → Isamibashi Bridge · the way home from schoolFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 350 mIsamibashi Bridge · the way home from school → Overpass near the Sakai boat landingFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 50 mOverpass near the Sakai boat landing → Nankai Sakai StationFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 200 mNankai Sakai Station → Sakai Station forecourtFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 50 mSakai Station forecourt → Sakai Nankai Bus stop 3Follow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 100 mSakai Nankai Bus stop 3 → PLAT PLAT — street signFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 100 mPLAT PLAT — street sign → PLAT PLAT · the fireworksFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 50 mPLAT PLAT · the fireworks → Sakai boat landing — historic signFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 150 mSakai boat landing — historic sign → Under the Nankai tracks · episode 3Follow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 100 mUnder the Nankai tracks · episode 3 → Nanban Bridge · the openingFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 50 mNanban Bridge · the opening → View of the Dragon Goddess statueFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~10 min · 750 mView of the Dragon Goddess statue → Former Ohama Gymnasium siteFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~10 min · 650 mFormer Ohama Gymnasium site → Ōhama Park · the lemons of episode 17Follow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 200 mŌhama Park · the lemons of episode 17 → Old Sakai Lighthouse · the endingFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~10 min · 750 mOld Sakai Lighthouse · the ending → Sidewalk beside Xavier ParkFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~25 min · 2.0 kmSidewalk beside Xavier Park → Xavier Park (Ebisu)Follow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 150 mXavier Park (Ebisu) → Xavier Park · the chocolate of episode 3Follow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 50 mXavier Park · the chocolate of episode 3 → Hanataguchi stop · the bike ride of episode 16Follow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 150 mHanataguchi stop · the bike ride of episode 16 → Sumiyoshi-toriimae stop · the endingFrom Hanataguchi stop north to Sumiyoshi-toriimae (¥240, 15 min).
Tram · Hankai line · ~15 min · ¥240Sumiyoshi-toriimae stop · the ending → Sumiyoshi Taisha — summer festivalFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 50 mSumiyoshi Taisha — summer festival → Sorihashi Bridge · the finishFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 100 mSorihashi Bridge · the finish → NambaAbout 5 min on foot to Nankai Sumiyoshitaisha station and the train to Namba (¥240, 9 min).
Nankai · ~15 min · ¥240
Namba → Kansai International AirportNankai airport express from Nankai Namba (¥970, 44 min).
Nankai · ~45 min · ¥970Kansai International Airport → Tannowa Tokimeki BeachNankai to Tannowa, changing at Izumisano (¥770, 44 min); from the station, about 30 min on foot (2.5 km) to the beach.
Nankai · ~75 min · ¥770Tannowa Tokimeki Beach → Hamadera Park swimming pool30 min on foot back to Tannowa and Nankai to Hamaderakōen, with two changes (¥690, 55 min); from the station, about 10 min on foot.
Nankai · ~95 min · ¥690Hamadera Park swimming pool → Shinkanaoka Station — exit 110 min on foot to Hamaderakōen, Nankai to Shin-Imamiya and the Midōsuji subway to Shinkanaoka (¥660, 49 min).
Nankai and Midōsuji subway line · ~60 min · ¥660Shinkanaoka Station — exit 1 → Abiko Ohashi Bridge over the Yamato RiverFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~35 min · 2.5 kmAbiko Ohashi Bridge over the Yamato River → Nagai Stadium — meeting point15 min on foot (1.1 km) to Abiko station, the Midōsuji subway to Nagai (¥190) and about 12 min on foot to the stadium.
Midōsuji subway line · ~30 min · ¥190Nagai Stadium — meeting point → Nagai Stadium — first dateFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 50 mNagai Stadium — first date → Nagai Stadium — south main stand entranceFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~5 min · 50 mNagai Stadium — south main stand entrance → Namba Parks — former café referenceAbout 12 min on foot to Nagai station and the Midōsuji subway to Namba (¥290, 14 min).
Midōsuji subway line · ~30 min · ¥290Namba Parks — former café reference → Nankai Namba StationFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~10 min · 500 mNankai Namba Station → Osaka Shochikuza TheatreFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~10 min · 500 mOsaka Shochikuza Theatre → Historic TOM’S HOUSE frontageFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~10 min · 550 mHistoric TOM’S HOUSE frontage → Hommachi StationFollow pedestrian crossings and open access. During works, use public streets around the perimeter.
On foot · ~20 min · 1.4 kmHommachi Station → MBS headquarters in ChayamachiMidōsuji subway from Honmachi to Umeda (¥190, 4 min) and about 10 min on foot to Chayamachi.
Midōsuji subway line · ~15 min · ¥190MBS headquarters in Chayamachi → Former Zepp Osaka siteSubway from Umeda to Cosmosquare, changing at Honmachi (¥290, 26 min); from there, about 12 min on foot.
Midōsuji and Chūō subway lines · ~40 min · ¥290Former Zepp Osaka site → Namba12 min on foot to Cosmosquare and the subway to Namba (¥290, 23 min).
Chūō and Sennichimae subway lines · ~35 min · ¥290
Walking legs between stops add up to about 15.2 km (~305 min without stops). Transport legs also include the walk to each station, given in their note.